Foothpaths under construction

Now that we are nearing completion the footpaths and ramps are now ready to be poured around the house.

We’ve a path running around the house with a ramp from the car park up to the porch & hall door for ease of access.  There are also 3 steps which will take you around the front of the house to the patio area in front of the living/dining room area.

We are leaving a 500mm gravel drainage area all around the perimeter of the house to enable drainage of rainwater from the walls and paths to easily soak away.  All the traps and gulleys from the sinks and appliances are located in the gravel area also.